Steel constructions of bridges
- pipe bridges as part of the supply of complete plant equipment AR 4,5 in Pardubice - 60t
- bitumen modified pipe bridges as part of the supply of complete plant equipment - 50t
Steel structures of poles
- telecommunication tower
| Plzen - Kosulka |
20t |
| Hrmenin |
10t |
| Jičín |
10t |
Steel structures of industrial buildings
- building of storage hall Princ color - 20t
- construction of workshop for dissolvent paraffine works - 70t
- railway stand in Pardubice - 25t
Supporting steel structures
- pipe bridges for drawing off to motor and railway containers - 100t
- pipe bridges for crude oil storing - Vitkovice - 80t
- supply and installation of bitumen residue pipeline - cat. 17
- material pipeline and oil rectifying - cat. 12
- filling station AR 12 - cat. 12
- supply and installation of cooling water piping Dn 400
- filling station mat. class 11
- double-jacketed pipeline for bitumen transfer (cat.11)
- pipeline for gas transfer DN 200
Storage tanks
- Mine Karvina - flotation oil storage reservoir, volume 4x20m3
- Paramo a.s. - bitumen storage tank, volume 500m3
- Paramo a.s. - slope economy storage tanks, volume 2x840m3
- Paramo a.s. - crude petroleum storage tanks, volume 1000m3
- Packaging Rychnov - bitumen storing, volume 2x104m3
- Prokop Enginering - oil storing tanks, volume 13x46m3
- Paramo - coleseed oil mixing and storing tank, volume 400m3
- Vitkovice - crude oil products's storage reservoir, volume 1500m3
- Vitkovice a.s. - installation of crude oil storage tanks, volume 5000m3
Equipment for chemical industry
- heater of SO1
- atmosphere columns
- propane deasphaltization - various equipment
- propane production- rvarious equipment
- stainless steel bundles of heaters
- air exchangers made of gilled tubes
Equipment for heat-power engineering
- atmospheric vapour releaser
- repair of the high-pressure steam piping in Paramo a.s. Pardubice
- high-pressure heater's pipe exchange in Paramo a.s. Pardubice - mat. cat. 15
|